Rebuilt a plumbing system after the framing.

11/30/19 Today I built a drainage and supply system for two bathrooms in a ceiling. I added pipe dope to the threads on a p-trap for the existing shower because it showed evidence of prior leaks. I tested the work for leaks and to make sure the supply had the correct configuration (hot and cold on the correct sides).