Month: November 2019
-
Rebuilt a plumbing system after the framing.
Joey Hamilton
11/30/19 Today I built a drainage and supply system for two bathrooms in a ceiling. I added pipe dope to the threads on a p-trap for the existing shower because it showed evidence of prior leaks. I tested the work for leaks and to make sure the supply had the correct configuration (hot and cold…
Follow Us
search
About
Lorem ipsum dolor sit amet, consec tetur adipiscing elit. Maecenas odio lacus, dignissim sollicitudin finibus commodo, rhoncus et ante.
categories
- Plumbing system bebuild (1)
- Uncategorized (1)
Archives
- February 2020 (1)
- November 2019 (1)